ACC 349 Final Exam Guide

ACC 349 Final Exam Guide

ACC 349 Final Exam Guide


To purchase this visit here
http://www.nerdypupil.com/product/acc-349-final-exam-guide/
Contact us at:
nerdypupil@gmail.com
ACC 349 Final Exam Guide

1) What does cost accounting measure, record, and report?

2) What is the best way to handle manufacturing overhead costs in order to get the most timely job cost information?

3) At the end of the year, manufacturing overhead has been overapplied. What occurred to create this situation?

4) Which of the following would be accounted for using a job order cost system?

5) In a job order cost accounting system, the Work in Process account is

6) Which one of the following is an important feature of a job order cost system?

7) Which one of the following is indirect labor considered?

8) Which of the following is an element of manufacturing overhead?

9) Which one of the following costs would be included in manufacturing overhead of a lawn mower manufacturer?

10) A well-designed activity-based costing system starts with

11) An activity that has a direct cause-effect relationship with the resources consumed is a(n)

12) In traditional costing systems, overhead is generally applied based on

13) All of the following statements are correct EXCEPT that

14) Which of the following is a value-added activity?

15) Which of the following is a nonvalue-added activity?

16) Poodle Company manufactures two products, Mini A and Maxi B. Poodle’s overhead costs consist of setting up machines, $800,000; machining, $1,800,000; and inspecting, $600,000. Information on the two products is:

Mini A Maxi B
Direct labor hours 15,000 25,000
Machine setups 600 400
Machine hours 24,000 26,000
Inspections 800 700

Overhead applied to Mini A using activity-based costing is

17) Poodle Company manufactures two products, Mini A and Maxi B. Poodle’s overhead costs consist of setting up machines, $800,000; machining, $1,800,000; and...

Similar Essays