BSA 376 ENTIRE COURSE
For more course tutorials visit
www.uoptutorial.com
BSA 376 Week 2 Individual Work Related Part I
BSA 376 Week 2 Individual Work-Related Projec Part I
BSA 376 Week 2 Team Project Draft Riordan Manufacturing
BSA 376 Week 3 Team Project Draft
BSA 376 Week 3 Work Related Project Analysis Part 2
BSA 376 Week 4 Team Project Draft
BSA 376 Week 4 Work-Related Project Analysis Part 3
BSA 376 Week 5 SDLC Paper and Presentation
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------
BSA 376 Week 2 Individual Work-Related Project Analysis, Part I
For more course tutorials visit
www.uoptutorial.com
Assignment Individual Health-Care Bar Coding-Electronic Records Write a 4- to 6-page paper that analyzes a work-related project using systems analysis for a selected business system at the departmental or divisional level.
• • Include information-gathering techniques and design methods used in the project.
• • Analyze and evaluate what made the project a success or failure. This situation is used as the basis for future individual assignments. Include 3 to 4 references relevant to the assignment, in addition to readings. Format your paper consistent with APA guidelines.
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------
BSA 376 Week 5 SDLC Paper and Presentation
For more course tutorials visit
www.uoptutorial.com
Complete the final section to include 4 to 6 pages on the following:
• • Testing process summary o Define a test plan or script identifying major software functionality and hardware to be tested with required outcomes.
• • Installation process and training plan summary o Provide a timeline identifying specific steps, including training, and related resources...