IT 242 UOP Course Tutorial / Uoptutorial

IT 242 UOP Course Tutorial / Uoptutorial

  • Submitted By: rockyange2
  • Date Submitted: 07/18/2014 6:02 AM
  • Category: Business
  • Words: 430
  • Page: 2
  • Views: 2


For more course tutorials visit

IT 242 Week 1 CheckPoint OSI Model

IT 242 Week 1 DQs

IT 242 Week 2 CheckPoint Signals

IT 242 Week 2 Assignment VOIP

IT 242 Week 3 DQs

IT 242 Week 4 CheckPoint ETHERNET or Token Ring

IT 242 Week 4 Assignment VLAN

IT 242 Week 5 CheckPoint Switching

IT 242 Week 5 DQs

IT 242 Week 6 CheckPoint Static or Dynamic

IT 242 Week 5 DQs

IT 242 Week 6 Assignment Router and Switch Configuration

IT 242 Week 7 CheckPoint Firewalls

IT 242 Week 7 DQs

IT 242 Week 8 CheckPoint WLAN

IT 242 Week 8 Assignment Wireless Signals

IT 242 Capstone Discussion Question

IT 242 Final Project WAN Design



For more course tutorials visit

Final Project WAN Design Resource Appendix A Due Date Day 7 [Individual forum] Read Appendix A. Develop a plan to set up a wide area network based on the scenario presented in Appendix A. Your plan must include the following An overview of the company and its needs A logical network drawing for Acme to depict the recommended WAN Recommendations for the type of leased lines the company should choose at each location, how each location will connect to headquarters, and whether or not each location should be able to connect with the others Recommendations for what type of telecommunications system would work best for Acme PBX or VoIP The IP address scheme, including the range of IP addresses, broadcast addresses, and subnets A VLAN to appropriately address Acme’s concerns that departments that are not grouped together are logically connected Recommendations for network equipment that should be placed at each...

Similar Essays