NETW 589 WEEK 5 CASE STUDY

NETW 589 WEEK 5 CASE STUDY

c
To purchase this visit following link:
http://www.activitymode.com/product/netw-589-week-5-case-study/

NETW 589 WEEK 5 CASE STUDY
To purchase this visit following link:
http://www.activitymode.com/product/netw-589-week-5-case-study/


Contact us at:
SUPPORT@ACTIVITYMODE.COM
NETW 589 WEEK 5 CASE STUDY
NETW 589 Week 5 Case Study Wireless Communication Keller

12 Power Point Slides Plus Speaker Notes
Case Description
The organization you work for has leased a building next door to the existing building. The local area networks in the new building and the existing building must be linked to each other. The distance is 657 feet. Here is the relationship of the two buildings.
Notice that the blue dashed line showing the route of the link crosses a parking lot not under your control. It also crosses a public street. Both buildings are two stories tall. From the second floor or the roof of each building there is a clear line of sight above the expected height of any vegetation currently in the area.

NETW 589 WEEK 5 CASE STUDY
To purchase this visit following link:
http://www.activitymode.com/product/netw-589-week-5-case-study/


Contact us at:
SUPPORT@ACTIVITYMODE.COM
NETW 589 WEEK 5 CASE STUDY
NETW 589 Week 5 Case Study Wireless Communication Keller

12 Power Point Slides Plus Speaker Notes
Case Description
The organization you work for has leased a building next door to the existing building. The local area networks in the new building and the existing building must be linked to each other. The distance is 657 feet. Here is the relationship of the two buildings.
Notice that the blue dashed line showing the route of the link crosses a parking lot not under your control. It also crosses a public street. Both buildings are two stories tall. From the second floor or the roof of each building there is a clear line of sight above the expected height of any vegetation currently in the area.

NETW 589 WEEK 5 CASE STUDY
To...

Similar Essays