BUSI650 Quiz 4

BUSI650 Quiz 4

BUSI650 Quiz 4
Click Link Below To Buy:
http://hwcampus.com/shop/busi650-quiz-4/
• Question 1
2 out of 2 points

The __________ plan is a preliminary, approximate schedule of an organization’s overall operations that will satisfy the demand forecast at minimum cost.
Answer


• Question 2
0 out of 2 points

Which of the following is FALSE about supply chains?
Answer


• Question 3
2 out of 2 points

The inventory turnover is calculated using the annual cost of goods sold and the aggregate inventory value on average.
Answer


• Question 4
0 out of 2 points

Which of the following statements about Supply Chain Management (SCM) is correct?
Answer


• Question 5
2 out of 2 points

It is not unusual for fire departments to use “slack months” for building inspections, conducting prevention programs and giving talks as a way to have anticyclic outputs.
Answer


• Question 6
2 out of 2 points

Assume that Company F produces a variety of smart phones sequentially on three machines. The times required on each machine for one typical racket are as follows: M1: 3 minutes M2: 8 minutes, M3: 2 minutes, M4: 5 minutes. The throughput time for a smart phone is :
Answer


• Question 7
2 out of 2 points

Purchasing tends to follow three practices; which of the following is NOT one of them?
Answer


• Question 8
2 out of 2 points

In order to leverage the location decision to enhance the development of long-term capabilities, the first step is to:
Answer


• Question 9
2 out of 2 points

Which of the following are measures of capacity in terms of outputs and inputs produced for the corresponding production system?
Answer


• Question 10
2 out of 2 points

Which of the following is/are (a) technique(s) used for increasing short-run capacity
Answer


• Question 11
2 out...

Similar Essays