How to Maintain Main Parts of Concrete Batching Plant?

How to Maintain Main Parts of Concrete Batching Plant?

  • Submitted By: shirely
  • Date Submitted: 01/23/2014 1:51 AM
  • Category: Biographies
  • Words: 432
  • Page: 2
  • Views: 47

How to maintain concrete batching machineHenan Daswell Machinery Co., Ltd,is a professional manufacturer and trader specializing in the research, development and production of construction machinery for nearly 30 years. Our main products are as follows:portable concrete mixer,portable concrete mixer,etc. We will provide you with the best product and service. When the ambient temperature is below 0 ° C, stirring every 12 weeks check the use of the additive storage bins and pneumatic. Should put the liquid the net storage tank and pipeline portable concrete mixers, to prevent the cracking. Mixing station flush, you should turn off the manual valve in the water supply pipes concrete mixers, and then open the manual ball valve to flush the pipeline, open the water supply pumps. 1. Aggregate batching system Aggregate set silo Wear liner wear and pressure plate bolts should be checked monthly, based on the use of the mixing station. And replace damaged liner and bolt. The first week of the mixing station, should be checked daily for all the sensors on the set silo bearing nut locking, later changed to a weekly check. 2 Belt Conveyor Used for the first time or after the maintenance of the power system should check whether the transport direction of the conveyor belt. The conveyor belt can not be used due to wear and rare tape machine must load starting. Failure for most of the deviation breakdown damage caused by human factors, should therefore check whether the various moving parts in normal operation, the conveyor belt or without deviation, without foreign body between the conveyor belt and the driven roller. There are exceptional circumstances, failure in the power supply should be immediately ruled out. Tension roller at a the hammer box of institutions belt running side occurs along the deviation in the sandbox opposite direction to add weight to adjust. 3 rope maintenance When wire rope every pitch wire breaking number of more than 5% of the total root root...

Similar Essays