BUS 517 BUS517 Complete Assignments
BUS 517 Assignment 1
http://workbank247.com/q/bus-517-assignment-1/2582
BUS 517 Assignment 2
http://workbank247.com/q/bus-517-assignment-2/2604
BUS 517 Assignment 3 Project Presentation
http://workbank247.com/q/bus-517-assignment-3-project-presentation/6797
BUS 517 Assignment 1
Take the Attached Business Plan called Steve's Waffle Fries Business Plan, and create a Project proposal of actually building and opening the store. Any thing missing from the Business plan that is needed to meet the requirements of the Project Plan can be made up. Please make sure that you meet ALL the requirements for the Project Proposal.
Here are the requirements for the assignment:
Write a seven to eight (8) page paper in which you:
1. Recommend a project portfolio management method for your selected project. Provide a rationale
for your recommendation. Note: Be sure to align your project with the strategic efforts of the
organization.
2. Create an outline of an executive summary that includes the type of problem, requirements, and
proposed business problem solutions.
3. State the vision and the goal of the project. Note: Be sure that the goals are Specific,
Measurable, Attainable, Realistic, and Timely (S.M.A.R.T.).
4. Determine five (5) major deliverables of the project, and explain the importance of each major
deliverable.
5. Provide the timeframe for delivering the solution to the project.
6. Create a table which contains the generic resources, including people, equipment, and materials
needed to undertake the project. Note: These are only generic figures to give the Project
Sponsor an idea of the level of resourcing required to finish the project.
7. Estimate the total budget for the project based on the cost of the resources specified in the table
that you have created. Next, add contingency and any other additional costs (e.g., intangible
costs, the cost of a change in culture or process...