Roller crusher must do the commissioning after installation,then it can be used for crushing materials.Great Wall company recommends the following details in the commissioning.
Roller crusher must do over 2 hours commissioning in the scene,the temperature of bearing can not exceed 30 degree centigrade when the roller crusher works.the highest
temperature is up to 40 degree centigrade.roller teeth and V-belt should be conducted stable, make sure roller crusher without noise,there are no abrasion between roller
crusher.
On basis of good roller crusher commissioning,roller crusher can do the load run,and the load run can not be less than 8 hours.
Great Wall Company mainly provides all kinds of large and medium sized grinding mills , crushers, rotary kilns and dryers for the area of construction materials, metallurgy, mining, chemical industry, environmental protection etc. The products are sold well both in domestic and abroad, especially in Eastern Europe, Middle East, Asia, Africa, North and South America, Oceania and so on.
1.Pre-sales Service
Offering comprehensive technical and business consultation services;
Proposing the most suitable scheme and equipment for our clients;
Designing and fabricating targeted products according to the special requirements of clients;
Training periodically high qualified service technician.
2.After-sales Service
Highly inspecting equipments in every working procedure, quality comes first;
Fast & Safe Delivery; Assisting our clients for foundation construction of equipments;
Dispatching engineers to install and debug equipments;
Training the first-line operators on site;
Regularly visit clients to solve production problems; Providing life-long maintenance service;
Related Products
http://www.greatwallmill.com/
http://www.greatwallcrusher.com/
http://www.greatwallcrusher.net/
http://www.chinacrushers.cn/
Rotary Kiln http://www.greatwallmill.com/product/rotarykiln.html
Ball...