IT 242 ENTIRE COURSE
For more course tutorials visit
www.uoptutorial.com
IT 242 Week 1 CheckPoint OSI Model
IT 242 Week 1 DQs
IT 242 Week 2 CheckPoint Signals
IT 242 Week 2 Assignment VOIP
IT 242 Week 3 DQs
IT 242 Week 4 CheckPoint ETHERNET or Token Ring
IT 242 Week 4 Assignment VLAN
IT 242 Week 5 CheckPoint Switching
IT 242 Week 5 DQs
IT 242 Week 6 CheckPoint Static or Dynamic
IT 242 Week 5 DQs
IT 242 Week 6 Assignment Router and Switch Configuration
IT 242 Week 7 CheckPoint Firewalls
IT 242 Week 7 DQs
IT 242 Week 8 CheckPoint WLAN
IT 242 Week 8 Assignment Wireless Signals
IT 242 Capstone Discussion Question
IT 242 Final Project WAN Design
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------
IT 242 WEEK 9 FINAL PROJECT WAN DESIGN
For more course tutorials visit
www.uoptutorial.com
Final Project WAN Design Resource Appendix A Due Date Day 7 [Individual forum] Read Appendix A. Develop a plan to set up a wide area network based on the scenario presented in Appendix A. Your plan must include the following An overview of the company and its needs A logical network drawing for Acme to depict the recommended WAN Recommendations for the type of leased lines the company should choose at each location, how each location will connect to headquarters, and whether or not each location should be able to connect with the others Recommendations for what type of telecommunications system would work best for Acme PBX or VoIP The IP address scheme, including the range of IP addresses, broadcast addresses, and subnets A VLAN to appropriately address Acme’s concerns that departments that are not grouped together are logically connected Recommendations for network equipment that should be placed at each...