BUS 446 Week 4 Quiz

BUS 446 Week 4 Quiz

BUS 446 Week 4 Quiz

Copy & Paste the link into your browser to download the tutorial:

http://www.usefulhomework.com/shop/bus-446/bus-446-week-4-quiz/




1. The first book on MRP was written by _____ in 1975.
2. The first step in the planning hierarchy is _____ planning.
3. Key inputs to the MRP information system are:
4. Cycle-time management is the aspect of _____ that applies to running a better production process for a flow shop.
5. Cycle times of inbound and outbound supplies are interconnected with which of the following?
6. _____ line-balancing methods employ “rule of thumb,” common sense, logical thinking, and experience to find near-optimal solutions for large problems.
7. Engineering design will be the preferred method for line-balancing
8. Queuing models make certain specific assumptions. Which of the following choices are reasonable assumptions under certain circumstances?
9. Heuristic models do which of the following?
10. _____ line-balancing exists when the assumption of fixed and deterministic times for operations and total process time is not correct.




BUS 446 Week 4 Quiz

Copy & Paste the link into your browser to download the tutorial:

http://www.usefulhomework.com/shop/bus-446/bus-446-week-4-quiz/




1. The first book on MRP was written by _____ in 1975.
2. The first step in the planning hierarchy is _____ planning.
3. Key inputs to the MRP information system are:
4. Cycle-time management is the aspect of _____ that applies to running a better production process for a flow shop.
5. Cycle times of inbound and outbound supplies are interconnected with which of the following?
6. _____ line-balancing methods employ “rule of thumb,” common sense, logical thinking, and experience to find near-optimal solutions for large problems.
7. Engineering design will be the preferred method for line-balancing
8. Queuing models make certain specific assumptions. Which of the following choices are reasonable...

Similar Essays