Check the width of the discharging mouth. If it does not in accordance with the requirement, please adjust it before starting the machine. After that check whether the electric interlocking device and audible signal are under normal situation Then check the level and temperature of the oil inside the oil box; if the oil temperature is below 20℃, heat it with a heater when starting it.
After the check and examination, if there is no any other question, start the portable cone crusher according to the instruction in the operation manual. After the oil temperature, oil pressure and the pressure of the cooling water reach the stipulated value and the oil pump runs for three to five minutes, start the portable cone crusher and starting material feeding.
When you successfully finished the above steps, check the running process. The material feeding must be even, and the granularity should conform to the requirement that is generally smaller than eighty percent of the feeding size. Please keep in mind that non-crushable materials are not allowed to insert into the crushing chamber to prevent them from damaging the spare parts of the equipment.
Regularly check the oil amount and oil temperature of the lubrication system. The temperature of the return oil should not exceed 60centi degree. Check the drainage condition of water seal and dust tight; if there is no water supply, the crusher is not allowed to run. Check whether the pipe of the water cooling system is smooth. And check the water amount and temperature.
Pay attention to checking the oil temperature of the locking oil cylinder and the machine can only run when the adjusting ring is in the tightly locking state.Regularly checking of the abrasion condition of the lining boards and the fastening condition of the spare parts is also very essential. If some parts are loose or seriously abraded or fall off, please immediately fasten it or timely change it.