Structured network cabling copper hyperlink detailed test parameters and fault analysis

Structured network cabling copper hyperlink detailed test parameters and fault analysis

  • Submitted By: lichangtui
  • Date Submitted: 04/15/2014 12:16 AM
  • Category: Business
  • Words: 2342
  • Page: 10
  • Views: 1

PDS technical improvement over the years, to meet the demands of greater performance device for transferring media, integrated wiring regular escalation, wiring program from category three to category five, Super 5, six and 7 categories of development, each link bandwidth even further enhanced. To make sure method stability at higher transfer rates and reliability is usually maintained at a good level, every normal upgrade transmission capacity on the hyperlink itself right after consideration of far more stringent specifications. In the perspective of integrated cabling systems and solutions, standard-setting precise benchmarks, only can complete all test projects through common wiring system, and its ability to hyperlink to match in. I take into account the General into the wiring technician at the time of acceptance or project link repair, divergence parameter fault judgment or location with no the hands, so this collection descriptions several test parameters of generic cabling method for future reference.

1, the make contact with map

Wiring diagram of the test is usually to confirm the wiring RJ45 plugs on each ends in the cable core connection. In terms of points, is followed by both T568A and T568B, both received law there's no difference in functionality, however the project calls for you have to make use of the similar technique for the construction.

Wiring diagrams fault: open circuit, brief circuit, crossed, wrong and crosstalk and so on.

1.1 open: refers to 8 core line cable of finish received appeared a root and the far more root core line connection disconnect topics, basic settlement strategy is verify module plus the appreciate line rack finish received, and jumper Crystal head pressure received situation, the subjects is engineering inside the most typical of errors, can in finish received Shi steer clear of, jumper as used original forming jumper, in extra info points of engineering inside the progress implementation of efficiency....