Compound crusher, (vertical compound crusher) is our senior engineer comprehensive similar breaker technology at home and abroad, and the advantages of both impact and heavy hammer crusher, the optimization design for the main technical parameters of new type fine grinding, coarse grinding products, mainly used for medium and small broken cement raw meal, clinker, used in building sand, iron ore, sandstone, gypsum, coal gangue, coal, and other hard ore crushing, especially suitable for hard limestone, dolomite, granite, basalt, such as making artificial sand or highway pavement stone processing. This compound crusher big crushing ratio, little energy consumption, stable running, simple structure, convenient operation and maintenance, etc.Is really a multipurpose new crushing equipment, high efficiency and low cost.

Compound crusher working principle: Material by machine upper vertical fall into a high-speed rotating impeller, under the action of centrifugal force at high speed, and another part of the umbrella form distribution near the impeller material to produce high speed impact and crushing, the material after crash into each other, and between impeller and casing to form vortex repeatedly hit each other, friction material and crushing, from the bottom to discharge, forming closed-circuit circulation many times, controlled by the screening equipment to achieve the required finished product granularity. And what we need to pay attention to the operation of combination crusher is as follows:




1, emergency fault of equipment operation, can stop first. Failure did not rule out before, cannot be forced to drive.

2, electrical equipment of compound crusher failure, should be handled by electrical personnel escape.

3, need to enter the machine internal inspection, must pull off the power switch and put up some signs. Check cleaning machines should be taken before the upper material, to prevent falling. Check finished commissioning, he must be good...