Work Break Down Structure

Work Break Down Structure

PROJECT SCOPE STATEMENT[1]


Note: Any work not explicitly included in the Project Scope Statement is implicitly excluded from the project.

|Create links to referenced documents (e.g., Link_To_… ) by using Insert ( Hyperlink on your toolbar. |
| |
|Note that all documents that are linked to the Scope Statement become part of the Project Scope and require the same degree of management control. |
|Such documents should be maintained in a separate Scope directory along with the Scope Statement. |

|Project Name: |Application to Monitor Device Status for Various Platforms. |
|Prepared by: |Naga Sandeep Ponduru |
|Date (MM/DD/YYYY): |09/16/13 |

|Version History (insert rows as needed): |
|Version |Date |Comments |
| |(MM/DD/YYYY) | |
|1.0 | | |
| | | |
| | |...

Similar Essays