Open Access

Open Access

West Bengal Electricity Regulatory Commission Charges for 5 MW at 11 KV industrial consumer availing Intra-State Open Acess for 1 Month
Monthly Open Acess Charges
CAPACITY 5 MW at 11 kV for one month (Short Term) Considering Tariff of WBSEDCL (Assuming 5MW power is SL No 1 2 3 4 5 Particular Total Power Transferred in a Month (Units) Transmission Loss of % in kind which will be deducted from the energy input Net Tranmission Charges(Rs./MW) Wheeling Charges(Paise/kWh) Wheeling Loss of % in kind which will be deducted from the energy input Net wheeling charge Rs./kwh F Operating Charges(SLDC Charges) [Rs./kWh] Charges Total(Rs.) Charges for 5 MW capacity for 1 Month(Rs.) Unit Remarks

A B C D 1292.15 55.35

3600000

Assuming LF=100% 4% Normative for Transmission system Charge is in Rs./MW/day

4076087 270543.91

Unit

E 0.5535 Rs./kwh 2165869.58

6

8% Normative technical loss for HV system as per Regulation 80% of the Wheeling Charge for Long Term Customer of respective category As per Regulation 3(a) of The West Bengal Electricity RegulatoryCommission(Miscellen eous Provisions) Regulation, 2005

7

G

2paise/100 unit

815.22

8 9 10 11 12 13 14

Reactive Energy Charges Cross Subsidy surcharge (Paise/unit) + Additional surcharge Interconnection Charges Standby Charges * Parallel operation charges Other Charge a) Meter Reading & Other Charges

H I J K L M

Assumed Nil since amount of Reactive energy drawn below 97% of normal voltage and at voltage higher than 103% of normal voltage is not known 224.99 9170788.14 Not yet fixed by the Commission Not Applicable here Will be finalised as per PPA between the Distribution Licensee and the OA customer as per The West Bengal Electricity Regulatory Commission(Open Acess) Regulations 2007 Not applicable in WBERC area As per Regulation 14.3.4 of The West Bengal Electricity Regulatory Commission(Open Acess) Regulations 2007 As per Regulation 14.3.5 of The West Bengal Electricity Regulatory...